Tata Steel’s Electric Arc Furnace Upgrade
Current project experience includes supporting the Tata Steel Electric Arc Furnace upgrade at Port Talbot, contributing to the civil and highway design associated with a major industrial infrastructure programme. The role includes highway and access-road design, Civil 3D modelling, earthworks development, drainage coordination and utility interfaces within a highly constrained operational site. Working as part of a multidisciplinary team, the focus is on resolving design interfaces, coordinating levels and infrastructure requirements, and developing practical, buildable solutions that support construction and long-term operation of the upgraded facility.